Search Results
Plan of Revised Framing, Sub-Basement Floor at Teaching Lab (8-S), 4/15/1920
19-1/2x23-1/4 inches
Oversize Tube 5
Change in Framing Adjacent to Administration Building (11-S), 9/15/1920, revised 11/1/1920
12-1/2x32 inches
Oversize Tube 5