Search Results
Elevations and Sections thru' High Point and Monitor (9), revised 2/23/1918
35x48-1/4 inches
Drawer 9, Folder 8
Structural Drawings, 2/11/1918, revised 2/15/1918
Ink-on-linen drawings with pencil and blue pencil revisions
Details of Girders in Monitor Walls and under Main Roof (1-S), 2/12/1918
31x42-1/2 inches
Drawer 9, Folder 9
Details of Roof Trusses, Monitor Framing and Bottom Chord Bracing (4-S)
34x49 inches
Drawer 9, Folder 9
Building "B" Cross-Sections thru' High and Low Portions (5-S)
34-3/4x48-3/4 inches
Drawer 9, Folder 9