Search Results
Control Cable Routing Schedule (84-E-1), 5/22/1942, revised 3/5/1943
ink-on-linen drawing
Oversize Tube 44
Map of Dual-Power Service from The Detroit Edison Company and Interconnections with Other Sources to Ford Bomber Plant (89-E), undated
16-1/2x24 inches
Oversize Tube 44
Details of Electrical Conduit and Connections for Compass Calibrating Turntable and Machine Room (120-E), 12/21/1942
pencil-on-linen drawing
Oversize Tube 45